Fighting Pages

Gulf Wars Gate Work Day

103-0391_IMG.JPG
103-0391_IMG.JPG
I'm finishing off the cut that Oxlade started.  Rafe's assisting with the shop vac so I can see what the hell I'm doing. 103-0394_IMG.JPG
103-0394_IMG.JPG
103-0398_IMG.JPG
103-0398_IMG.JPG
The bottom quarter is done, and the top quarte is started on the left.  On the right a full set is completed and laid out longways. 103-0399_IMG.JPG
103-0399_IMG.JPG
103-0400_IMG.JPG
103-0400_IMG.JPG
Rafe and Martin provide a sense of perspective here.  Btw, Martin is 6'3" or so, and Rafe's 6'1 or so... These doors are TALL. 104-0401_IMG.JPG
104-0401_IMG.JPG
104-0403_IMG.JPG
104-0403_IMG.JPG
Bringing the doors down to make sure that they are flush and that the curves match well. 104-0404_IMG.JPG
104-0404_IMG.JPG
104-0405_IMG.JPG
104-0405_IMG.JPG
On the right, the shire that brought you these cool doors. 104-0407_IMG.JPG
104-0407_IMG.JPG
104-0408_IMG.JPG
104-0408_IMG.JPG
Pavel (THE Pavel) joins us to help finish off the last quarter 104-0411_IMG.JPG
104-0411_IMG.JPG
104-0412_IMG.JPG
104-0412_IMG.JPG
Slaine is doing an excellent job of directing the workers :) 104-0413_IMG.JPG
104-0413_IMG.JPG
104-0419_IMG.JPG
104-0419_IMG.JPG
Pavel Sands off the Labels that we'd not removed :) and the guys move the door to the top of the garage. 104-0420_IMG.JPG
104-0420_IMG.JPG

Page:   1  2  3 

[ Prev ]      [ Next ]