Fighting Pages
Gulf Wars Gate Work Day
103-0391_IMG.JPG
I'm finishing off the cut that Oxlade started. Rafe's assisting with the shop vac so I can see what the hell I'm doing.
103-0394_IMG.JPG
103-0398_IMG.JPG
The bottom quarter is done, and the top quarte is started on the left. On the right a full set is completed and laid out longways.
103-0399_IMG.JPG
103-0400_IMG.JPG
Rafe and Martin provide a sense of perspective here. Btw, Martin is 6'3" or so, and Rafe's 6'1 or so... These doors are TALL.
104-0401_IMG.JPG
104-0403_IMG.JPG
Bringing the doors down to make sure that they are flush and that the curves match well.
104-0404_IMG.JPG
104-0405_IMG.JPG
On the right, the shire that brought you these cool doors.
104-0407_IMG.JPG
104-0408_IMG.JPG
Pavel (THE Pavel) joins us to help finish off the last quarter
104-0411_IMG.JPG
104-0412_IMG.JPG
Slaine is doing an excellent job of directing the workers :)
104-0413_IMG.JPG
104-0419_IMG.JPG
Pavel Sands off the Labels that we'd not removed :) and the guys move the door to the top of the garage.
104-0420_IMG.JPG
Page:
1
2
3
[
Prev
] [
Next
]